It sounds like a simple enough question. You are building, converting or extending a home and somebody mentions SAP. Do you actually need a calculation, and if you do, when should it be carried out?
For a new house or flat in England, the answer is usually straightforward. SAP forms part of the route used to demonstrate compliance with Part L of the Building Regulations.
For extensions and conversions however, the answer can be less obvious. Not every project follows the same route and not every alteration needs a full SAP assessment.
That is why we would rather look at the project first than ask a client to decide which report they think they need.
When do you actually need SAP calculations?
For a new-build house or flat, SAP calculations would normally be expected as part of demonstrating Part L compliance. That applies whether you are building one home or a larger residential development.
The point that is sometimes missed is that SAP should form part of the design process. It is not something best left until the end when the windows have been ordered, the heating system has been chosen and the construction details are already on site.
Conversions are more nuanced. Turning a commercial building into residential accommodation, converting a barn, or changing the number of dwellings within an existing property can trigger Building Regulations requirements through a material change of use but that does not automatically mean the project follows exactly the same compliance route as a new dwelling.
Extensions, loft conversions and garage conversions are different again. They do not automatically require a full SAP calculation. In many cases compliance can be demonstrated through the standards applying to the individual building elements and services. In other cases, particularly where an extension has a large amount of glazing, SAP modelling can be used to demonstrate that the overall proposal performs acceptably.
So if somebody tells you that every extension needs SAP, or that no extension ever does, we would be cautious. The correct answer depends on the design and the compliance route being used.
Why timing matters
This is where SAP can either be useful or become a frustration.
If the assessment is carried out while the design is still developing there is usually room to make sensible changes. A different window specification, an adjustment to insulation, a change to heating or ventilation, or a review of thermal bridging can be considered alongside cost, appearance and buildability.
Find out that the design falls short after products have been ordered or installed and the same conversation becomes rather more difficult.
Large areas of glazing are a good example. They may be central to the design but they can also have a significant effect on heat loss and overheating. If that is picked up early the project team can test options before committing to an order. Pick it up late and the choices are usually narrower and more expensive.
Early SAP work does not guarantee a problem-free project. What it does is reduce the chance of discovering an avoidable compliance issue when there is very little room left to manoeuvre.
The assessment should follow the design
A SAP calculation is only useful if it reflects what is actually being designed and built.
We normally start by reviewing the drawings and an indicative construction specification. The design-stage calculation then gives the team a route to compliance and highlights any areas that need attention.
If the specification changes during construction, the SAP model should be revisited rather than assuming the replacement product or detail will perform in exactly the same way.
That might sound obvious but projects change. Insulation products are substituted, windows move, heating systems change and details are value engineered. Each change may seem relatively small in isolation but together they can alter the result.
Towards completion, the final assessment needs to reflect what has actually been built so that the relevant compliance documentation and EPC can be produced.
What information does a SAP assessor need?
You do not need every detail finalised before speaking to an assessor.
To get started we would want floor plans, elevations and sections, an indicative construction specification and an idea of the project programme. If Building Control has already raised a particular question, that is useful to see as well.
From there the assessor can identify what is confirmed, what is still missing and which decisions are likely to have the greatest effect on the calculation.
Good information matters. Where details are missing, assumptions may have to be made and, as we have said in other articles, assumptions are not always kind to the result.
What if I only need an EPC for an existing home?
That is a different type of assessment.
If you are selling or letting an existing home, the EPC would normally be produced using RdSAP, or Reduced Data Standard Assessment Procedure. RdSAP is designed for existing dwellings where all of the detailed information available for a new-build SAP assessment may not be accessible during a site survey.
So a homeowner who simply needs an EPC for an existing property would not normally commission the same design-stage SAP process used for a new development.
And what about the 2026 Part L changes?
There is one further complication at the moment: the regulatory standard itself is changing.
The 2026 edition of Approved Document L has been published and, for most building work in England, the associated changes come into force on 24 March 2027 subject to transitional arrangements.
That means the applicable standard cannot always be identified simply by looking at the latest document on GOV.UK. The project start date, Building Control route and transitional provisions can all matter.
It is worth confirming the position before the design is finalised rather than discovering later that the project team has been working to the wrong set of requirements.
SAP or SBEM?
Another question we are asked surprisingly often is whether a project needs SAP or SBEM.
The simple distinction is that SAP is used for dwellings, while non-domestic buildings use the National Calculation Methodology, commonly through SBEM software.
Mixed-use developments can therefore need both. A scheme with flats above commercial space is an obvious example: the residential and non-domestic elements may need to follow different assessment routes.
Again, the safest approach is to describe the project first and establish the right methodology from there.
The simple rule
If you are building a new house or flat, expect SAP to form part of the compliance process.
If you are converting or extending an existing home, do not assume either way. The nature of the work and the chosen compliance route matter and whichever route applies, involve the assessor while there is still time for the calculation to influence the design rather than simply report on it afterwards.
At Murton & Co we support developers, architects and project teams with SAP calculations, Part L compliance and wider energy performance advice. We would much rather help establish the right route at the beginning of a project than explain at the end why a finished design needs to change.
Here are some common questions we get asked:
Do all extensions need SAP calculations?
No. Most extensions will need Building Regulations approval and the Building Control Officer will usually advise whether any additional energy calculations are required. If the glazing does not exceed the 25% allowance no further calculation may be needed. Where there is more glazing, for example large bi-fold doors or rooflights, an Area-Weighted U-value calculation or Whole Dwelling SAP assessment may be required. The extension will also need to meet the insulation and energy-efficiency standards in Approved Document L1, so it is important to involve Building Control before work starts.
When should SAP calculations be carried out?
Ideally while the design is still developing and before key products and specifications are fixed. This gives the project team more scope to respond if the initial calculation identifies a shortfall.
Is SAP the same as an EPC?
No. SAP is the calculation methodology used to assess the energy performance of a dwelling. An EPC is the certificate that communicates the building’s energy rating. For an existing home, an EPC is normally produced using RdSAP rather than a new-build design-stage SAP assessment.
Can a development need both SAP and SBEM?
Yes. A mixed-use scheme can require SAP for its residential elements and a non-domestic methodology, commonly SBEM, for commercial or other non-domestic parts of the development.
Not sure whether your project needs SAP calculations?
Start with the project, rather than trying to choose a report yourself.
Tell Murton & Co what you are building or converting, where it is and how far the design has progressed. Share the drawings you have available and any questions raised by building control.
We can help establish the assessment support you need and when to involve it, so energy compliance informs your decisions from the outset.